Manufacturing · Westcliffe, CO

Critical Path Metalworks, INC.

According to OSHA enforcement records (2010–2026), Critical Path Metalworks, INC. ranks #92,138 of 99,447 penalized U.S. employers by total current penalty, with a average safety record: 3 violations across 2 inspections.

Lower half by penalty0% serious
$540
OSHA penalties
3
Violations cited
2
OSHA inspections
#92,138
of 99,447 penalized employers

Critical Path Metalworks, INC. in Westcliffe, CO has been the subject of 2 OSHA workplace inspections and 3 citations since 2010, according to enforcement records from the U.S. Department of Labor. Total penalties assessed: $540. All enforcement data below is sourced from the DOL public enforcement databases at data.dol.gov.

The record in one line

OSHA has inspected Critical Path Metalworks, INC. 2 times over 2 years, roughly annually. These inspections resulted in 3 violations, averaging 1.5 per inspection. According to OSHA enforcement records, its total current penalty ranks #92,138 of 99,447 penalized U.S. employers (the lower half of penalized employers nationally). Against the Manufacturing industry average of 3 inspections per employer, this runs moderately below peers (0.8x the sector average) on inspection frequency. For comparison, Machine Craft Northwest INC in Lebanon, OR is another manufacturing employer with 4 OSHA inspections on record and $540 in current penalties.

1.5
violations per inspection
0.0%
of violations were serious
#92,138
of 99,447 penalized employers

Compliance score

C 68/100
  • C OSHA safety compliance: 3 violations across 2 OSHA inspections (1.5 per inspection), vs. national p10 0.0 (best) / p90 5.5 (worst) among 145,626 inspected employers.

Channels are separate federal datasets: a dimension marked not applicable simply has no record in that dataset for this employer, not a good or bad score.

Open my watchlist

How Critical Path Metalworks, INC. compares on OSHA penalties

Total current penalty vs the Manufacturing per-employer average

in penalties

What this shows Critical Path Metalworks, INC. runs well below peers (0.03x the sector average) in total OSHA penalties.

Source U.S. Department of Labor, OSHA enforcement extracts As of 2026

Where this penalty ranks nationally

Total current OSHA penalty vs every U.S. employer with a nonzero penalty

$540 Top 7% most affordable more affordable than 93% of 99,447 U.S. employers with a penalty

$0–$5,000: 43,959 U.S. employers with a penalty (44%). This entry sits in this band. $5,000–$10,000: 20,304 U.S. employers with a penalty (20%). Above this entry. $10,000–$15,000: 11,027 U.S. employers with a penalty (11%). Above this entry. $15,000–$20,000: 6,546 U.S. employers with a penalty (7%). Above this entry. $20,000–$25,000: 4,175 U.S. employers with a penalty (4%). Above this entry. $25,000–$30,000: 2,877 U.S. employers with a penalty (3%). Above this entry. $30,000–$35,000: 2,036 U.S. employers with a penalty (2%). Above this entry. $35,000–$40,000: 1,493 U.S. employers with a penalty (2%). Above this entry. $40,000–$45,000: 1,095 U.S. employers with a penalty (1%). Above this entry. $45,000–$50,000: 785 U.S. employers with a penalty (1%). Above this entry. $50,000–$55,000: 5,150 U.S. employers with a penalty (5%). Above this entry. This employer $0 $55,000 every penalized U.S. employer, bucketed by value

Each bar is a $5K-wide band; taller bars hold more U.S. employers with a penalty. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count, share, and where it sits relative to this entry.

Source U.S. Department of Labor, OSHA enforcement extracts · 2026

Does more inspection scrutiny mean more findings?

Each dot is one of 21 Manufacturing employers with an OSHA inspection on record, placed by inspections and violations cited. The highlighted dot is Critical Path Metalworks, INC..

Frequently inspected, many findingsRarely inspected, many findingsFrequently inspected, clean recordBelow median on both1.92.022.02.0014.729.444.058.7OSHA inspectionsViolations citedTYSON FOODS INC., OSHA inspections: 2 · Violations cited: 5SHELL CHEMICAL LP, OSHA inspections: 2 · Violations cited: 10STELLAR SNACKS, LLC., OSHA inspections: 2 · Violations cited: 6CRAFTSMEN INDUSTRIES INC, OSHA inspections: 2 · Violations cited: 8FLEETWOOD HOMES, INC, OSHA inspections: 2 · Violations cited: 13KINGSPAN INSULATED PANELS, OSHA inspections: 2 · Violations cited: 18D'ARCY LABORATORIES, LLC, OSHA inspections: 2 · Violations cited: 7PEERLESS PRODUCTS INC, OSHA inspections: 2 · Violations cited: 3E-Z SPUDS LLC, OSHA inspections: 2 · Violations cited: 10DAVID PRICE METAL SERVICES, INC., OSHA inspections: 2 · Violations cited: 6CHEMTRADE SOLUTIONS, LLC, OSHA inspections: 2 · Violations cited: 4S.I. SHREVEPORT CORPORATION, OSHA inspections: 2 · Violations cited: 14WILEN VEGAS, OSHA inspections: 2 · Violations cited: 4SOMETHING SWEET, INC., OSHA inspections: 2 · Violations cited: 6GLOBAL FOREST PRODUCTS, LLC, OSHA inspections: 2 · Violations cited: 56NATIONAL MAINTENANCE & REPAIR OF LOUISIANA, INC, OSHA inspections: 2 · Violations cited: 2THE KEENEY MANUFACTURING COMPANY INC, OSHA inspections: 2 · Violations cited: 6NORMA PRECISION INC., OSHA inspections: 2 · Violations cited: 10BUFFALO QUALITY FEED MILL, OSHA inspections: 2 · Violations cited: 20JMC OF JONESBORO, INC., OSHA inspections: 2 · Violations cited: 18Critical Path Metalworks, INC., OSHA inspections: 2 · Violations cited: 3
Critical Path Metalworks, INC. has 2 OSHA inspections on record and 3 violations cited. The crosshair marks the median among these Manufacturing peers. Across this sector's tracked employers, more inspections is moderately associated with more violations found -- not a coincidence, but not a guarantee either.

Critical Path Metalworks, INC. in the Manufacturing enforcement ledger

Manufacturing sector: Critical Path Metalworks, INC. is the #33,713 heaviest OSHA penalty carrier of 35,243 employers with nonzero fines ($540).

How Critical Path Metalworks, INC. Compares

Critical Path Metalworks, INC.'s 1.50 violations per inspection compares to the Manufacturing sector average of 8.0 violations per employer.

Against the Manufacturing industry average of $15,763 per employer, this employer's current OSHA penalty runs well below peers (0.03x the sector average).

Enforcement detail

OSHA Inspection History

Total Inspections

2

First Inspection

2016-06-30

Last Inspection

2018-11-13

Inspection Span

2 yrs

Violations / Inspection

1.5

Avg Penalty / Inspection

$270

Industry Avg / Inspection

$6,093

What this shows 2 inspections over 2 years, averaging 1.5 violations per visit. That's $270 per inspection vs. the Manufacturing average of $6,093.

Enforcement detail

Violation Breakdown

0

Serious

0.0% of total

0

Willful

0.0% of total

0

Repeat

0.0% of total

3

Other-Than-Serious

100.0% of total

What this shows Serious violations involve hazards that could cause death or serious physical harm. Willful violations indicate intentional or knowing disregard of the law. Repeat violations are for hazards previously cited within the past 5 years.

Enforcement detail

Penalty Analysis

Initial Penalty Assessed

$900

Current Penalty Amount

$540

Penalty Reduction

40.0%

What this shows Penalties were reduced by $360 from the initial assessment of $900. Reductions may result from informal settlements, formal contests, or negotiated agreements with OSHA.

Industry Safety Context: Manufacturing

How Critical Path Metalworks, INC. compares to the Manufacturing sector, which has 44,645 employers tracked by PlainWorker.

Metric Critical Path Metalworks, INC. Industry Avg
Inspections 2 2.6
Violations 3 8.0
Total Penalty $540 $15,763
Avg Penalty per Inspection $270 $6,093

Nationwide Manufacturing peers with similar penalties or inspection counts

Two OSHA-record peer sets for Critical Path Metalworks, INC., both outside CO so the neighborhoods are not geographic containment.

Nearby & Similar Employers in Manufacturing

Showing 5 of 44644 other employers tracked in this sector.

Compare Critical Path Metalworks, INC. vs Flowers Baking CO. of Baton Rouge, LLC side-by-side →

What to do with this record

Use Critical Path Metalworks, INC.'s enforcement history as one data point, not the whole picture.

  • A single employer's record can look unusual in isolation. Compare Critical Path Metalworks, INC. against Flowers Baking CO. of Baton Rouge, LLC, a similarly-sized employer in the same sector, before drawing conclusions. Compare side-by-side
  • See whether Critical Path Metalworks, INC.'s inspection and penalty record is typical for Manufacturing or an outlier against the sector's own average. View the Manufacturing sector
  • Before you accept a job or raise a safety concern, search any employer for its own OSHA inspection history the same way you found this one. Search employers

Figures reflect closed OSHA and WHD federal enforcement actions on record (2010–2026); not every workplace issue results in an inspection or investigation.

Frequently Asked Questions

Is Critical Path Metalworks, INC. safe to work at? ▼
Based on OSHA records, Critical Path Metalworks, INC.'s workplace safety record is average, with typical for this industry. The employer has 3 violations across 2 inspections. Compared to Manufacturing industry peers, this is below average for penalties. Review the full inspection history below for details.
How many OSHA violations does Critical Path Metalworks, INC. have? ▼
Critical Path Metalworks, INC. has 3 OSHA violations on record, including 0 serious, 0 willful, and 0 repeat violations. The total current penalty amount is $540.
How many OSHA inspections has Critical Path Metalworks, INC. had? ▼
Critical Path Metalworks, INC. has had 2 OSHA inspections, with the first recorded on 2016-06-30 and the most recent on 2018-11-13. This averages 1.5 violations per inspection.
What is the total penalty amount for Critical Path Metalworks, INC.? ▼
Critical Path Metalworks, INC. has been assessed $540 in current OSHA penalties, reduced from an initial assessment of $900 (a 40.0% reduction).
What industry does Critical Path Metalworks, INC. operate in? ▼
Critical Path Metalworks, INC. operates in the Manufacturing sector (NAICS code 332312). This industry has 44,645 employers tracked by PlainWorker, with 115,492 total OSHA inspections and $703.72M in cumulative penalties.
Where does Critical Path Metalworks, INC. rank nationally on OSHA penalties? ▼
Among the 99,447 U.S. employers with a nonzero current OSHA penalty in PlainWorker's corpus, Critical Path Metalworks, INC. ranks #92,138 (the lower half of penalized employers nationally). The ordinal is a live COUNT of employers with a lower total_current_penalty; see the methodology page for the exact derivation.
How does Critical Path Metalworks, INC.'s safety record compare to industry average? ▼
Critical Path Metalworks, INC.'s total OSHA penalty of $540 is below the Manufacturing industry average of $15,763 per employer. The employer has 2 inspections compared to the industry average of 2.6 per employer. For a direct comparison, Machine Craft Northwest INC in Lebanon, OR is a similar manufacturing employer with $540 in current penalties.
Data Sources & Methodology ▼

Data as of 2026. Source: U.S. Department of Labor (OSHA, WHD).

Source: OSHA Enforcement Data

Inspection and violation records from the Occupational Safety and Health Administration (OSHA), U.S. Department of Labor, covering the period 2010–2026. Includes inspection dates, violation types (serious, willful, repeat, other-than-serious), and penalty amounts. Penalties shown are current assessed amounts and may differ from original citations due to settlement, contest, or reduction.

Source: Wage and Hour Division (WHD)

Compliance actions from the WHD, covering enforcement of the Fair Labor Standards Act (FLSA), including minimum wage, overtime, and child labor violations. Back wages represent amounts owed to affected employees as determined by WHD investigations.

Employer Matching

Employers are matched across OSHA and WHD datasets by name, state, and city. Employers included in PlainWorker have 2 or more OSHA inspections or $1,000+ in WHD back wages. Data is updated monthly from data.dol.gov.

Verify with OSHA establishment search →

Every figure on PlainWorker is rendered directly from official U.S. Department of Labor OSHA and Wage & Hour Division enforcement records, no number is typed in by an editor. This employer's ratios (penalty-per-violation, industry comparisons) are computed live from the 2 inspections on record. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2026.